5, :

2024
  • WG B5.85 Protection, control and supervision principles of grid stabilizing generation, : 2024 . - 2027 .
  • WG B5.84 Recommendations and constraints for development and interfacing of virtual IEDs implemented in PACS, : 2024 . - 2028 .
2023
  • WG B5.83 Protection for modern distribution networks, : 2023 . - 2025 .
  • WG 5.82 Education, qualification and continuing professional development of engineers in protection, automation and control, : 2023 . - 2024 .
  • WG 5.81 Obsolescence management for protection, automation and control systems, : 1- 2023 . - 1- 2027 .
2022
  • JWG B5/C4.79 Protection roadmap for low inertia and low fault current networks, : 2022 . - 2024 .
  • WG 5.78 New requirements of network protection and control for renewable energy integration, : 2022 . - 2025 .
  • WG 5.77 Requirements for information technologies (IT) and operational technology (OT) managed protection, automation and control systems (PACS), : 2022 . - 2025 .
2021
  • WG 5.76 Architecture, Standards and Specification for metering system in a Digital Substation and Protection, Automation and Control environment, : 2021 . - 2024 .
  • WG 5.75 Documentation and version handling related to Protection, Automation and Control functions, : 2021 . - 2024 .
2020
  • WG 5.74 Busbar protection considerations when using IEC 61850 process bus, : 2021 . - 2025 .
  • WG 5.72 Modelling, Assessment, and Mitigation of Protection Performance Issues caused by power plants during Dynamic Grid Events, : 2020 . - 2022 .
  • WG 5.71 Protection, Automation and Control Systems Communication Requirements for Inter-Substation and Wide Area Applications, : 2020 . - 2023 .
2018
  • WG 5.70 Reliability of Protection Automation and Control System of power systems Evaluation Methods and Comparison of Architect, : 2019 . - 2022 .
  • WG 5.69 Experience gained and Recommendations for Implementation of Process Bus in Protection, Automation and Control Systems, : 2019 . - 2022 .
  • WG 5.68 Optimisation of the IEC 61850 Protection, Automation and Control Systems (PACS) engineering process and tools, : 2019 . - 2022 .
  • JWG 5_D2.67 Time in Communication Networks, Protection and Control Applications, : 2018 . - 2021 .
  • WG 5.65 Enhancing Protection System Performance by Optimising the Response, : 2018 . - 2022 .
2017
  • WG 5.66 Cyber Security requirements for PACS and the Resilience of PAC Architectures, : 2018 . - 2020 .
  • WG 5.64 Methods for Specification of Functional Requirements of Protection, Automation, and Control, : 2017 . - 2020 .
  • WG 5.63 Protection, Automation and Control System Asset Management, : 2017 . - 2020 .
  • WG 5.62 Life Cycle Testing of Synchrophasor Based Systems used for Protection, Monitoring and Control , : 2017 . - 2020 .
  • JWG B5/C4.61 Impact of Low Inertia Network on Protection and Control, : 2017 . - 2020 .
  • WG 5.60 Protection, Automation and Control Architectures with Functionality Independent of Hardware, : 2017 . - 2019 .
2016
  • WG B5.59Requirements for Near-Process Intelligent Electronic Devices, : 2016 . - 2019 .
  • WG B5.58Faster protection and network automation systems: implications and requirements, :1- 2016 . -2019 .
  • WG B5.57New challenges for frequency protection, : 2016 . - 2018 .
2015
  • WG 5.56Optimization of Protection Automation and Control Systems, : 2015 . -2018 .;
  • WG 5.55Application of Travelling Wave Technology for Protection and Automation, : 2015 . -2017 .;

, science@cigre.ru.

46- CIGRE B5 ( (),21-26 2016 ) ( 5 , - 12 2016 .)